Global Foam Lightweight market trend 2023-2030 Construction Precautions for Foam Lightweight Soil by Newsexpost-news

European Commission President Ursula von der Leyen recently called on India and other countries to support sanctions against Russia over the Ukraine incident. At The Raisina Dialogue forum, von der Leyen said, "We earnestly appeal to all members of the international community to support our efforts to achieve lasting peace."  

Von der Leyen says countries around the world that have been suffering from the virus for two years must now deal with higher food, energy, and fertilizer prices. What is happening in Ukraine will not only determine the future of Europe, but also have profound implications for the rest of the world.

Because of the Russia-Ukraine conflict, the prices of many other commodities like the Foam Lightweight are expected to continue to rise in the future.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


Prior to the impact of COVID-19 on the chemicals and materials industry and the price of the Foam Lightweight, many industry observers expected low to flat growth in 2021 in all regions outside Asia, with many countries seeing slower growth compared to recent years. Operational excellence has long been a hallmark of the Foam Lightweight chemical industry, and many companies are financially able to withstand short-term dips in end-market demand due to rapid leverage from reduced capex on hand.

The analysis shows that, whatever the final course of the pandemic, we can expect the inevitable long-term effects. Workplaces are expected to slowly return to pre-COVID-19 practices. Companies investing in enterprise-wide digital initiatives saw these "payoffs" in the early pandemic environment. For more information about Foam Lightweight, please feel free to contact us.

Inquery us

Our Latest Answers

Global Cuprous Oxide Cu2O,Overview of Cuprous Oxide Cu2O, Application of cuprous oxide Cu2O powder,Cuprous oxide Cu2O powder price,Cuprous oxide Cu2O powder supplier market trend 2024-2030 What are copper and cuprous oxide? by Newsexpost-news

Cuprous oxide is a bright red powder, almost insoluble in water, decomposed into divalent copper and copper in acidic solution, and gradually oxidized into black copper oxide in humid air. Commonly used as a pigment, biocide and antifouling agent in…

Global amorphous boron market trend 2025-2028 Is boron amorphous or crystalline? by Newsexpost-news

Is boron amorphous or crystalline?Boron can be prepared in several crystalline and amorphous forms. The well-known forms of crystallization are α-rhombohedral (α-R), β-rhombohedral (β-R) and β-tetragonal (β-T). In spec…

Global copper oxide market trend 2024-2028 What does copper oxide do? by Newsexpost-news

What is copper oxide?Copper oxide is an inorganic substance. Copper oxide chemical formula is CuO. It is a black oxide of copper. Slightly bisexual and slightly hygroscopic. Insoluble in water and ethanol, easily soluble in acid, thermally stable, de…